Brisbane Erosion Hazard Assessment: When Small Sites Rate Medium
November 16, 2026
Brisbane’s erosion hazard assessment rates a small site medium on one yes in six questions. What that adds, who certifies, and how to book the pre-start.
Ecology guides, legislation updates, and project insights for Queensland developers, planners, and landowners.
November 16, 2026
Brisbane’s erosion hazard assessment rates a small site medium on one yes in six questions. What that adds, who certifies, and how to book the pre-start.
September 29, 2026
Type a Queensland address into biodiversitychecker.au and get a free report on koala habitat, threatened species, weeds and waterways. Built by seven students at Peachester State School, with the technology donated by Queensland Ecologists.
September 24, 2026
If your Queensland approval conditions an ESCP, or you will disturb more than 2,500 square metres, you need a certified erosion and sediment control plan before earthworks. Who signs it, what each SEQ council asks for, and the fines if you skip it.
September 8, 2026
Queensland’s regulated vegetation management map was re-certified on 3 September 2026, and clearing from now is assessed against that version. Check your lot, and lock the categories in with a PMAV before you clear, sell, subdivide or lodge.
September 8, 2026
Somerset Region Planning Scheme Version 5.0 has applied since 4 June 2026. Council’s own koala habitat map and koala outcomes are gone, the clearing exemptions were rewritten as locally accepted vegetation clearing, and the catchment table now points to the Biodiversity overlay code. What to check, and the one-year section 29 window.
September 8, 2026
H5 bird flu is confirmed in Queensland: a petrel on Moreton Island (25 July 2026) and a shearwater at Castaways Beach (25 August). What landholders, developers and survey crews must report, what changes on site, and what does not.
August 28, 2026
Land mapped high risk on the flora survey trigger map may require a flora survey before clearing. What the trigger map requires, where category X and a development approval leave you short, and what to do when the clearing has already happened.
August 28, 2026
Council previously indicated Logan Plan would commence in late 2026, but after more than 4,000 submissions and ongoing flood mapping work it is reviewing the timeline. What the current overlays control, what a council scheme does not change, and the one year superseded scheme window.
August 25, 2026
Fraser Coast Regional Council has proposed Amendment Package 1, re-cutting biodiversity, waterways and wetlands mapping to align with State MSES, adding a new environmental assessments policy and removing the standalone Vegetation Management Code. Consultation closed 1 May 2026 and submissions are under review.
August 17, 2026
Gympie Regional Council has a biodiversity TLPI in force from 23 February 2026. What developers and landowners need to know about the overlay, the Rural Zone, and vegetation clearing while the new planning scheme is prepared.